YEMEN LNG project with Total shares of 39.6% was launched in August 2005 after signing three LNG plant with supply up to 12.5 billion cubic meter (bcm) of gas per year from the Block 18 of the Marib - Jawf field. We have been appointed as the pipeline transport with +100 trucks operating 24/7 for 18 months.